Eight stages. You commit to one at a time.
Every project runs through the RIBA Plan of Work: the industry's standard stages from first idea to handover. Here is what each one actually involves and how long it usually takes. Nothing on this page requires you to sign up for the next stage before you have seen the last one.
The stages
From a conversation to a finished building.
Appraisal and brief
We start with the Property Insight Report for your address (constraints, precedent, the local market), then a 30-minute call to turn it into a plan. If you go ahead, we visit, measure the building, and agree a written brief: what you want, what it must cost, and when.
Concept design
Options, not a single answer. We test two or three ways the brief could work, sketch them up, and price the front-runner with one of our builders, so the design you fall for is one you can afford to build.
Planning
The chosen scheme developed into a planning application or a lawful development certificate, with the drawings, forms and statements the council expects. We handle the submission and the correspondence. Where a scheme has been refused before, this is where our planning consultants come in.
Technical design
Planning drawings are not construction drawings. Now we produce the set a builder can price and build from: construction details, building regulations package, specification, and coordination with the structural engineer.
Tender and appointing a builder
Comparable prices from builders we trust, on the same drawings and the same specification, so you are comparing like with like. Then a proper contract, not a quote on headed paper.
On site, as your Contract Administrator
We put a JCT building contract in place between you and the builder, and act as Contract Administrator under it. That means the price, the programme and the quality are written down and legally binding on both sides: we inspect regularly, answer the builder's questions, value the work and certify payment only for what has been built properly, control variations before they become bills, and certify practical completion. Your money and the work are protected by the contract, not by goodwill.
Handover and in use
Completion certificates, the health and safety file, and the defects period: the months after handover when anything that settles or sticks gets put right at the builder's cost, not yours.
Durations are typical for householder work in London and Essex and depend on the council, the site and how quickly decisions come back. We will give you a programme for your project at Stage 1.
Being straight with you
What's not in our fee.
Some costs sit outside any architect's fee. We will tell you about them at Stage 1 so nothing arrives as a surprise.
- 01Council fees: planning application, building control, pre-application advice
- 02The structural engineer, where the scheme needs one
- 03Specialist surveys: topographical, arboricultural, ecological, drainage
- 04Party wall surveyor fees, where neighbours are affected
- 05Utility consents: build-over agreements, connections
- 06The building work itself, and any CIL liability
Get in touch
Tell us about the project.
Whether it is a first conversation or a scheme someone else has already started, we are happy to hear where you have got to.
Want the facts first? Start with the Property Insight Report. It comes with a free 30-minute call. If you then hire us as your architect for the project, the report fee comes off our fee.