Five projects, four told from the record.

Most architects' portfolios show you the finished photograph. The first is a design study, told from the drawing board; the other four are written from the decision notices: what was asked for, what the council said, what we did about it, and where it ended up. Dates and decisions are quoted from the notices themselves. We hold back addresses and reference numbers to protect our clients' privacy, and will share them on request.

91%

of our planning applications approved: first decision, including resubmissions we led

0 appeals

needed at Maulden: after another agent's appeal was dismissed, we found the route that needed no permission at all

18 days

from measured survey to a validated planning application at Holmes Lane

Where the work is

Three hundred projects, two hemispheres.

Every pin is a scheme Dandi has taken through planning, construction, or both, at the practices she worked with over twenty years, and now as DZP Studio. Each pin names the practice and her role.

London, Essex & the East

The home ground, at the closest zoom that still holds every DZP project: Bedfordshire in the west, Ipswich in the east.

East Africa, the Gulf & China

Twenty years of work is not all within driving distance of Epping. Uganda, Dubai, and nine cities across China.

Open the full map →

01 · Design study · Newham

Same plot, same brief. Two answers.

East London, E13 · Feasibility study for an accountancy practice · Not yet submitted

Option 2: a brick office with the top floor cantilevered over the entrance, on the same street viewOption 1: a fully glazed office with planted terraces on each floor, visualised from the streetOption 1 · glass and plantingOption 2 · brick and cantilever
Drag the line. Both options are visualised from the same viewpoint on the same street, so only the building changes.
Project
A new small office on the back of the client's own land, for their accountancy practice
Brief
Modern and individual: a building that stands apart from the traditional ones around it
Stage
Feasibility study: six design options drawn, two taken to the final client meeting
Images
Our design, visualised from our 3D model with AI-assisted rendering

The brief

An accountancy practice in East London owns the land behind its premises and wanted to build its own office on it: small, modern, and unlike anything in the street. The street is Victorian terrace on one side and a 1930s block on the other, so unlike had to be earned rather than shouted.

What we did

We drew six options and tested every one against the same street view and the same site photograph, which is why the two finalists can be compared on one picture. Option 1 dissolves the building in glass and planting, so the office reads as a garden stacked three floors high. Option 2 holds a solid brick volume and floats the top floor out over the entrance.

Where it is

The study stops at feasibility, by design. The client left the final meeting with two buildings they wanted, which is the right problem to have, and the planning conversation starts from there.

6 options drawn, 2 in the final meeting

From the drawing board: a DZP Studio feasibility study. The visualisations are of our design, rendered with AI assistance from our 3D model.

02 · Developers · Epping Forest

One house became three. Then the real work started.

North Weald Bassett, Epping · Epping Forest District Council · Developer client

Three-dimensional view of the three proposed houses at North Weald Bassett, from the construction drawing set
All three houses, from the construction set (drawing M25/6/06, issued for construction). The section and wall detail on our homepage are from the same set.
Project
Part demolition, extension and conversion of a three-bedroom house into two semi-detached four-bedroom houses, plus a new detached four-bedroom house. Existing garage demolished.
Planning
Granted 29 November 2024, with a section 106 agreement and conditions
Conditions
Details for conditions 3, 4, 5, 6, 7, 15 and 19 submitted; decision 1 July 2025
Our role
Technical design and full construction drawings, discharge of conditions, CDM risk assessment, drawing issue control, support on site
Status
Under construction

The brief

A single three-bedroom house on a generous plot outside Epping, and a developer who could see three homes on it: the existing house split and extended into a pair of semi-detached four-bedroom houses, and a new detached house alongside. The client bought the site with planning permission already granted, in November 2024.

The obstacle

A permission is not a licence to start. This one came with a section 106 agreement and a string of pre-commencement conditions (surface-water drainage, a tree protection plan and arboricultural method statement, site set-up, materials), each of which has to be submitted, negotiated and formally discharged before a spade goes in. Developers lose months here, usually because the conditions are treated as paperwork rather than design.

What we did

We treated the conditions as the first stage of construction, not the last stage of planning. The drainage strategy, tree protection and site logistics were resolved together with the technical design, so the details submitted to the council were the details the builder would build from. Seven conditions went in as one application; the council issued its decision on 1 July 2025, with the drainage condition following. All conditions have since been discharged.

Alongside that we produced the full construction set (plans, street elevations, sections, wall details) and the CDM risk assessment, and ran the drawing issue register so everyone on site was working from the current revision.

The outcome

Three houses being built from one address, with the council's conditions dealt with as part of the design rather than after it.

1 → 3 homes on a single plot

From the record: Epping Forest District Council decision notices of 29 November 2024 and 1 July 2025.

03 · Prior approval · Havering

Six metres, approved, and buildable the same day.

Brentwood Road, Gidea Park, Romford · London Borough of Havering · Homeowner

Three-dimensional rear view of the approved single-storey extension at Brentwood Road
Rear view of the approved scheme, revision D. The glazed box breaks the length of the boundary wall, and the eaves along the fence are kept low.
Project
Single-storey rear extension, 6 m deep, to make one kitchen and living room across the back of the house
Route
Larger home extension: prior approval under permitted development (Class A)
Decision
Prior approval not required (approved), 4 August 2025
Also
Building Regulations full-plans approval, Thames Water build-over technical submission, construction drawings

The brief

A 1930s semi with a narrow, deep garden and a kitchen that had nothing to do with the living room. The owners wanted the full six metres the permitted development rules allow, so the two rooms could become one space opening onto a new patio.

The neighbour

A six-metre extension on a 1930s semi runs close to the boundary, and what the council weighs is the next-door neighbour's outlook, not the rulebook. So the scheme is drawn to the neighbour's window: the eaves along the boundary held at 2.48 m, a glazed box to break the length of the wall, and the extension shaped at the neighbour's side so the full depth reads as a garden room rather than a wall.

What we did

Rather than waiting for the planning answer, we took the scheme through Building Regulations full-plans approval and prepared the Thames Water build-over submission in the same weeks, so that the day the approval arrived the owners could price and start.

The outcome

On 4 August 2025 Havering confirmed that prior approval was not required. With the building regulations already approved, the owners had a buildable six-metre extension the same day.

6 m deep, approved, with building regulations already in hand

From the record: London Borough of Havering decision notice of 4 August 2025.

04 · Planning decision: refused, appeal dismissed · Central Bedfordshire

After a lost appeal, the route that didn't need permission.

Maulden, Bedfordshire · Central Bedfordshire Council · Homeowner

Three-dimensional view of the converted garage building at Maulden, with new doors and rooflights
The garage building as converted: new glazed doors, rooflights front and back, two bedrooms and a shower room upstairs, all within the certificate.
History
An earlier application to convert the garage block into a separate dwelling was refused; the appeal was dismissed on 25 March 2025 on highway safety, flood risk and location (a scheme by a previous agent, before we were appointed)
Our route
Conversion of the garage to habitable space for the house, with new doors and front and rear rooflights: lawful without planning permission
Decision
Lawful Development Certificate issued 12 March 2026
Also
Pre-application advice on guest accommodation and a future subdivision of the site, ongoing

The brief

A large house down an unmade lane, with a detached garage block the owners wanted to turn into living space. By the time they came to us, in November 2025, they had already been refused and had lost an appeal: a scheme to make the garage a separate house had failed on the access track, on drainage, and on the site being in the wrong place for a new dwelling.

The obstacle

The temptation after a dismissed appeal is to argue harder: a new report, a new consultant, the same application. The inspector's reasons were about a new dwelling, and they were not going to change.

What we did

We read the appeal decision for what it did not say. Converting a garage into rooms for the existing house is not “development” at all under section 55 of the Planning Act, and the external changes (new doors, rooflights front and back) fall within permitted development. None of the inspector's three reasons touched that. So we drew the conversion the owners actually wanted (kitchen and living room, study, utility, two bedrooms and a shower room above) and applied for a Lawful Development Certificate rather than planning permission.

The outcome

Central Bedfordshire issued the certificate on 12 March 2026. The owners have a legally watertight document, the space they wanted, and no committee. The wider questions (guest accommodation, splitting the site) are now going through pre-application advice with the council on the strength of that certainty.

A refusal tells you what the council won't accept. Our job is to find what they can't refuse.

From the record: Planning Inspectorate appeal decision of 25 March 2025; Central Bedfordshire Council lawful development certificate of 12 March 2026.

05 · Homeowners · East Hertfordshire

Measured on the 12th. Submitted on the 30th. Approved.

Holmes Lane, Bishop's Stortford · East Herts Council · Homeowner

Three-dimensional front view of Holmes Lane with the garage converted and a new single-storey side extension
Front view: the garage becomes a room, and a single-storey side extension with a rooflight takes its place.
Project
Garage conversion into habitable space, with a single-storey side extension
Route
Householder planning application
Timeline
Measured survey 12 March 2026 · drawings issued 21 March · application received and registered 30 March
Decision
Planning permission granted with conditions, 2026
Next
Building Regulations and construction drawings, when the client is ready to start

The brief

A family house at the end of a short terrace with an integral garage that had never held a car. The owners wanted the garage back as a room and a modest single-storey extension to the side, done quickly and without drama.

What we did

We measured the house on 12 March, drew the proposal and the three-dimensional views by 21 March, and the application was registered by East Herts on 30 March. Eighteen days, including a round of changes with the owners. The drawings show the neighbour's house on the front elevation, so the officer could see at a glance how the extension sits against the neighbouring house.

The outcome

Permission granted with conditions. The notice records that the council “considered the applicant's proposal in a positive and proactive manner”, which is what happens when an application arrives complete, with nothing for the officer to chase. As a householder application it was exempt from biodiversity net gain, which we confirmed up front rather than letting it become a question.

18 days from survey to validated application

From the record: East Herts Council decision notice, 2026.

Also on the drawing board

More DZP Studio work, 2025–26.

Consented, in progress or on site across East London and Essex. Case studies follow as each one completes.

Three-dimensional rear view of a terraced house in Ilford with a new loft dormer
Bedford Road, Ilford · loft conversion with rear dormer and Juliet balcony · planning approved
Three-dimensional front view of a house at Cecil Avenue, Hornchurch, with a first-floor side extension
Cecil Avenue, Hornchurch · rear infill and first-floor side extension · planning approved June 2026 · Thames Water build-over agreed
Three-dimensional front view of a new house at Woodside View, Benfleet, with solar panels on the roof
Woodside View, Benfleet · new house with air-source heat pump and solar · planning appeal in progress

Earlier work

Twenty years before DZP Studio had a name.

Before the practice, our director worked on some of the most recognisable buildings of the last two decades (from the UK Pavilion at the Shanghai Expo to a 210,000 m² mixed-use quarter in Shenzhen and a bank headquarters in Oman) and on projects as small as a café on a beach and a restaurant in a pub. Different scale, same habits: a drawing that can be built, and a design that earns its budget. Completed as part of the teams at the practices concerned, before DZP Studio; images courtesy of those practices and their photographers.

The UK Pavilion at the Shanghai Expo 2010, a cube of thousands of acrylic rods, under construction
UK Pavilion, Shanghai Expo 2010
Aerial view of a domed visitor attraction set in landscaped gardens beside water
Eden Project
A low café with a rippled weathering-steel shell on the shingle at Littlehampton beach
Littlehampton café, West Sussex
Restaurant interior with chandeliers made of draped chain, Konstam at the Prince Albert, London
Konstam at the Prince Albert, London
Small studio buildings with folded, crinkled metal roofs set among pine trees at dusk
Creative units and art centre
Concept sketch of a bank branch for a younger generation, with open lounge seating and screens
A bank branch for Generation Y · concept
Visual of three glass towers above a curved podium, UCD Nanshan District B, Shenzhen
UCD Nanshan District B, Shenzhen · 210,000 m² mixed-use · project architect
Visual of the National Bank of Oman headquarters, a stepped stone-clad office building with deep shading
National Bank of Oman headquarters · design architect · built

Your address next

Every one of these started with the same question: what can be built, and is it worth it?

The Property Insight Report answers it for your address (planning constraints, precedents, values and yield), checked by a chartered architect before it is sent, then gone through with you on a 30-minute call with a chartered architect. £149. If you then hire us as your architect for the project, it comes off our fee.